A hotel reservation gives a crew somewhere to stay. Crew rest planning determines whether the time between duties and the arrangements around that stay support the operator’s requirements. Aviation Services Management (ASM) can coordinate HOTAC (crew hotel accommodation) and transfers around the window supplied by the operator.
This guide concentrates on timing and changes. For booking details and room arrangements, read what HOTAC means in aviation.
Start with the applicable scheme
The operator must establish the rules and approved scheme that apply to its crew and operation. A convenient hotel check-in time is not the start of a universal regulatory rest calculation. Crew fitness, fatigue management, duty release and the next report time remain matters for the operator and crew under their procedures.
| Example framework | What the cited provision says |
|---|---|
| EASA ORO.FTL.235 | At home base, the stated minimum is the preceding duty or 12 hours, whichever is greater, subject to the provision’s accommodation derogation. Away from base, it is the preceding duty or 10 hours, whichever is greater, with an eight-hour sleep opportunity plus travel and physiological needs. |
| FAA 14 CFR 117.25(e) | For operations to which this provision applies, the pre-duty rest period is at least ten consecutive hours measured from release from duty and must allow at least eight uninterrupted hours of sleep opportunity. |
These examples are not interchangeable rules for every charter or airline. Consult the current EASA rest provisions and associated material or FAA §117.25 only within their applicable scope. The operator must also account for other relevant limitations and approvals.
Build a sequence of real milestones
| Milestone | Planning question |
|---|---|
| Duty release | When does the operator expect the crew to finish the duties that precede rest? |
| Airport exit and hotel transfer | What clearance, walking, vehicle and travel time is realistically expected? |
| Room access | Will a suitable room actually be available when the crew arrives? |
| Hotel departure | When must the crew leave to reach the required reporting point? |
| Next duty report | What report time has the operator assessed and approved? |
Keep hotel occupancy, sleep opportunity and regulatory rest as separate concepts. The hotel and transport team supplies logistical facts; the operator applies them to its rest assessment. Record the date and time zone for every milestone, especially around midnight or time-zone changes.
Treat transfer time as part of the plan
An airport hotel may be close on a map yet require a slow terminal exit or indirect transfer. Confirm the actual pickup point, access arrangements and travel estimate. EASA’s AMC1 ORO.FTL.235(b) specifically addresses extra travel time beyond thirty minutes; it is another reason to pass realistic transfer information to the operator rather than calculate compliance from room hours alone.
Ask for written confirmation of early room access or late checkout where the window requires it. A request on a booking is different from a confirmed room arrangement. Tell the operator promptly if the planned accommodation or access time changes.
Set a trigger for reassessment
- A later duty release or arrival changes the usable hotel window.
- A longer transfer or delayed room access reduces the planned opportunity.
- An earlier departure or reporting time changes the end of the window.
- A disrupted stay or fatigue concern needs review under the operator’s procedures.
Keep the revised facts and the operator’s response together. Do not move a pickup earlier simply to preserve the advertised departure time before the operator has reviewed the consequences.
For a separate operational example, see ASM’s long-haul crew-duty case study. Its outcome is not a general rest entitlement or service guarantee.
Crew-rest planning FAQs
Can ASM approve the rest period?
No. ASM coordinates hotel and transport logistics. The operator determines the required rest, approves suitable accommodation and assesses crew compliance and fitness.
Which time should the hotel team receive?
Provide the required room-access and checkout times as well as the operator-approved rest and reporting plan. Include the date, time zone and next update contact.
Discuss your requirement with ASM
Send the duty-release estimate, required room-access window, next report time, crew count and transfer requirements. Arrangements remain subject to provider availability and operator approval. Contact Aviation Services Management (ASM) or email sales@asm.aero. Phone: +971 4 409 7755. WeChat: ASMDXB.
Keep Your Flight Operations Moving Worldwide
From flight planning and permits to ground handling, aviation fuel, diversion support and crew logistics, ASM coordinates the operational requirements surrounding every sector through 24/7 global support.


